❌

Reading view

NHPC commences operation of Subansiri lower hydro project’s 250 MW unitΒ 

NHPC has commenced commercial operation of the third unit of the Subansiri lower hydroelectric project. The project comprises eight units, each with a capacity of 250 MW, thereby taking the project’s total planned capacity to [...]

The post NHPC commences operation of Subansiri lower hydro project’s 250 MW unitΒ  appeared first on Renewable Watch.

  •  

JSW Energy acquires Tidong Power Generation Private Limited

JSW Neo Energy Limited, a wholly-owned subsidiary of JSW Energy Limited, has finalised the acquisition of Tidong Power Generation Private Limited from Statkraft IH Holding AS. The enterprise valuation is approximately Rs 17.28 billion. This [...]

The post JSW Energy acquires Tidong Power Generation Private Limited appeared first on Renewable Watch.

  •