Reading view

TGGENCO announces results of 375 MW/1,500 MWh BESS auction

Telangana Power Generation Corporation Limited (TGGENCO) has announced the results of its auction for setting up 375 MW/1,500 MWh standalone battery energy storage systems (BESS). Coal India and Sarus Infrastructures both have secured 187.5 MW/750 [...]

The post TGGENCO announces results of 375 MW/1,500 MWh BESS auction appeared first on Renewable Watch.

  •  

NTPC Limited announces results of  2,334 MWh BESS auction

NTPC Limited has announced the results of its auction for setting up 2,334 MWh of battery energy storage systems (BESS) across its thermal power stations in Karnataka, Maharashtra, Bihar, Andhra Pradesh, and Telangana. GR Infraprojects [...]

The post NTPC Limited announces results of  2,334 MWh BESS auction appeared first on Renewable Watch.

  •  

DEWA Reaffirms Rapid Power Restoration Capability with Automatic Smart Grid Restoration System

Dubai Electricity and Water Authority (DEWA) has reaffirmed its ability to restore electricity supply with exceptional speed through its Automatic Smart Grid Restoration System, the first such system in the […]

The post DEWA Reaffirms Rapid Power Restoration Capability with Automatic Smart Grid Restoration System appeared first on SolarQuarter.

  •