❌

Reading view

TGGENCO announces results of 375 MW/1,500 MWh BESS auction

Telangana Power Generation Corporation Limited (TGGENCO) has announced the results of its auction for setting up 375 MW/1,500 MWh standalone battery energy storage systems (BESS). Coal India and Sarus Infrastructures both have secured 187.5 MW/750 [...]

The post TGGENCO announces results of 375 MW/1,500 MWh BESS auction appeared first on Renewable Watch.

  •  

NTPC Limited announces results ofΒ  2,334 MWh BESS auction

NTPC Limited has announced the results of its auction for setting up 2,334 MWh of battery energy storage systems (BESS) across its thermal power stations in Karnataka, Maharashtra, Bihar, Andhra Pradesh, and Telangana. GR Infraprojects [...]

The post NTPC Limited announces results ofΒ  2,334 MWh BESS auction appeared first on Renewable Watch.

  •  

Power Ministry’s Chintan Shivir 2026 Concludes, Outlines Roadmap to 100 GW Hydro Pumped Storage by 2035–36 and Strengthens DISCOM Reforms

The two-day β€˜Chintan Shivir’ of the Ministry of Power, held on 22–23 January 2026 at Parwanoo, Himachal Pradesh, concluded today, bringing together senior officials, industry leaders, regulators, and academicians to […]

The post Power Ministry’s Chintan Shivir 2026 Concludes, Outlines Roadmap to 100 GW Hydro Pumped Storage by 2035–36 and Strengthens DISCOM Reforms appeared first on SolarQuarter.

  •