Summary:

β€”-

**1. Official Details of the Amendment:**
– **Regulation Name:** Telangana Electricity Regulatory Commission (Licensee’s Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026.
– **Regulation No.:** 01 of 2026.
– **Date of Notification:** 17th January 2026.
– **Effective From:** The date of its publication in the Telangana Gazette.
– **Amends:** The Principal Regulation (No. 4 of 2013) and its First Amendment (No. 1 of 2015).

**2. Primary Objective:**
– To **simplify and expedite** the process for releasing **new LT connections** and **additional loads** in electrified areas.
– To introduce **uniform, objective, and load-based Service Line Charges**, eliminating the need for individual site inspections and case-by-case estimations.

**3. Key Amendments Introduced:**

**A. New Service Line Charges (SLC) for Overhead Line Connections (Clause 7.1):**
– Applies to new/additional **LT connections** (excluding LT-VIII: Temporary supply & Electrification of Layouts) within **1 km of an electrified network**.
– Charges are **per kW of contracted load** and vary by consumer category.
– **Excludes** cost of terminal and metering arrangements (borne by licensee).
– **Distribution Licensee must supply and erect the Distribution Transformer at its own cost and maintain it.**

**B. Category-wise Service Line Charges (Rs./kW):**

| Category | Load Bracket | Service Line Charges |
| :β€” | :β€” | :β€” |
| **LT-I: Domestic** | Up to 1 kW | β‚Ή500 |
| | Above 1–5 kW | β‚Ή500 + β‚Ή600/kW |
| | Above 5–20 kW | β‚Ή2,900 + β‚Ή1,500/kW |
| | Above 20 kW | β‚Ή10,000/kW |
| **LT-II: Non-Domestic/Commercial, LT-VI (Street Lights), LT-VII (General)** | Up to 1 kW | β‚Ή1,000 |
| | Above 1–5 kW | β‚Ή1,000 + β‚Ή1,200/kW |
| | Above 5–20 kW | β‚Ή5,800 + β‚Ή2,000/kW |
| | Above 20 kW | β‚Ή10,000/kW |
| **LT-III: Industries** | Up to 20 kW | β‚Ή4,000/kW |
| | Above 20 kW | β‚Ή10,000/kW |
| **LT-IV: Cottage Industries** | All loads | β‚Ή1,000/kW |
| **LT-V: Agriculture** | All loads | β‚Ή1,000/kW (No ORC from farmers) |
| **LT-IX: EV Charging Stations** | Up to 1 kW | β‚Ή1,000 |
| | Above 1–20 kW | β‚Ή1,000 + β‚Ή1,200/kW |
| | Above 20 kW | β‚Ή8,000/kW |

**Important Note for Apartments/Complexes:** Combined contracted load of the building is considered for levying SLC.

**C. Revised Rules for Development Charges & Transformers (Clause 8.3):**
– **For dedicated transformers** in commercial complexes/apartments **NOT covered under the new SLC system**, the licensee recovers the **full transformer cost**, owns and maintains it, and cannot supply other consumers from it. **No Development Charges** are levied.
– **For connections COVERED under the new SLC system (Clause 7.1):**
– **Load ≀ 20 kW** (individual or combined for buildings): Pay **Development Charges** (as per Schedule) **plus SLC**.
– **Load > 20 kW** (individual or combined for buildings): Pay **SLC only**. **No Development Charges**.

**D. New Clauses Added:**
– **Clause 13:** Empowers the Commission to issue **orders and practice directions** for implementing this regulation.
– **Clause 14:** Grants the Commission the power to **amend, suspend, or repeal** any provision of this regulation in the future.

**4. Business Implications:**
– **For Consumers (Applicants):**
– **Predictable Costs:** Transparent, upfront Service Line Charges based on load and category.
– **Faster Processing:** Simplified process eliminates individual estimations and inspections for standard cases.
– **Lower Cost for Agriculture & Cottage Industries:** Fixed low rate of β‚Ή1,000/kW.
– **EV Charging Support:** Separate, slightly lower tariff slab to promote EV infrastructure.
– **No Transformer Cost:** Licensee bears the cost and maintenance of the distribution transformer for connections under the new SLC system.

– **For Distribution Licensees (DISCOMs):**
– **Streamlined Operations:** Uniform charges reduce administrative burden.
– **Revenue Clarity:** Clear framework for recovering connection costs.
– **Asset Ownership & Maintenance:** Responsible for transformers under the new SLC system.
– **Proposal Right:** Can file for revision of Service Line Charges periodically.

– **For the Regulatory Framework:**
– **Standardization:** Moves away from discretionary site-specific estimates.
– **Promotes Electrification:** Simplified and subsidized rates for key sectors (Agriculture, Cottage Industries, EV).
– **Future Flexibility:** Commission retains power to issue directives and amend rules as needed.

β€”-

For more information please see below link:

  •  

Inviting comments/suggestions/objections on Draft DERC (Terms and Conditions of Open Access) (Second Amendment) Regulations – EQ

Summary:

β€”-

## **1. Overview**
This document is a **public notice/circular** issued by the **Delhi Electricity Regulatory Commission (DERC)**. It announces the **proposal to amend** the existing **Delhi Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005** (referred to as the β€œPrincipal Regulations”). The amendment is titled **”Draft Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) (Second Amendment) Regulations, 2025β€³**.

β€”

## **2. Legal Authority**
The amendment is proposed in exercise of powers conferred under:
– **Section 39** of the Electricity Act, 2003
– **Section 40** of the Electricity Act, 2003
– **Section 42** of the Electricity Act, 2003
– **Section 181** of the Electricity Act, 2003

β€”

## **3. Availability of Draft Regulations**
– The **draft amendment regulations** are available on the **DERC website**: **[www.derc.gov.in](http://www.derc.gov.in)**

β€”

## **4. Invitation for Stakeholder Feedback**
– **Stakeholders** (including consumers, generators, distribution companies, traders, etc.) are invited to submit:
– **Suggestions**
– **Comments**
– **Objections**
– **Submission Deadline**: **12 February 2026, by 5:00 PM**
– **Submission Methods**:
1. **By Post**: To the **Secretary, DERC** at the Commission’s address.
2. **By Email**: **[secyderc@nic.in](mailto:secyderc@nic.in)**

β€”

## **5. Issuance Details**
– **Date of Circular**: **23 January 2026**
– **Issued By**: **Joint Director (PS&E)**, Delhi Electricity Regulatory Commission

β€”

## **6. Key Implications**
– **Regulatory Update**: This amendment aims to revise the open access terms and conditions in Delhi’s electricity sector, potentially impacting **power generators, distribution licensees, consumers, and traders**.
– **Public Consultation**: DERC is following a **transparent, consultative process** by inviting stakeholder feedback before finalizing the regulations.
– **Next Steps**: After the feedback period, DERC will review the inputs and issue the final amended regulations.