TGERC (Licenseeβs Duty for Supply of Electricity on Request) Second Amendment Regulations, 2026 β EQ
Summary:
β-
**1. Official Details of the Amendment:**
β **Regulation Name:** Telangana Electricity Regulatory Commission (Licenseeβs Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026.
β **Regulation No.:** 01 of 2026.
β **Date of Notification:** 17th January 2026.
β **Effective From:** The date of its publication in the Telangana Gazette.
β **Amends:** The Principal Regulation (No. 4 of 2013) and its First Amendment (No. 1 of 2015).
**2. Primary Objective:**
β To **simplify and expedite** the process for releasing **new LT connections** and **additional loads** in electrified areas.
β To introduce **uniform, objective, and load-based Service Line Charges**, eliminating the need for individual site inspections and case-by-case estimations.
**3. Key Amendments Introduced:**
**A. New Service Line Charges (SLC) for Overhead Line Connections (Clause 7.1):**
β Applies to new/additional **LT connections** (excluding LT-VIII: Temporary supply & Electrification of Layouts) within **1 km of an electrified network**.
β Charges are **per kW of contracted load** and vary by consumer category.
β **Excludes** cost of terminal and metering arrangements (borne by licensee).
β **Distribution Licensee must supply and erect the Distribution Transformer at its own cost and maintain it.**
**B. Category-wise Service Line Charges (Rs./kW):**
| Category | Load Bracket | Service Line Charges |
| :β | :β | :β |
| **LT-I: Domestic** | Up to 1 kW | βΉ500 |
| | Above 1β5 kW | βΉ500 + βΉ600/kW |
| | Above 5β20 kW | βΉ2,900 + βΉ1,500/kW |
| | Above 20 kW | βΉ10,000/kW |
| **LT-II: Non-Domestic/Commercial, LT-VI (Street Lights), LT-VII (General)** | Up to 1 kW | βΉ1,000 |
| | Above 1β5 kW | βΉ1,000 + βΉ1,200/kW |
| | Above 5β20 kW | βΉ5,800 + βΉ2,000/kW |
| | Above 20 kW | βΉ10,000/kW |
| **LT-III: Industries** | Up to 20 kW | βΉ4,000/kW |
| | Above 20 kW | βΉ10,000/kW |
| **LT-IV: Cottage Industries** | All loads | βΉ1,000/kW |
| **LT-V: Agriculture** | All loads | βΉ1,000/kW (No ORC from farmers) |
| **LT-IX: EV Charging Stations** | Up to 1 kW | βΉ1,000 |
| | Above 1β20 kW | βΉ1,000 + βΉ1,200/kW |
| | Above 20 kW | βΉ8,000/kW |
**Important Note for Apartments/Complexes:** Combined contracted load of the building is considered for levying SLC.
**C. Revised Rules for Development Charges & Transformers (Clause 8.3):**
β **For dedicated transformers** in commercial complexes/apartments **NOT covered under the new SLC system**, the licensee recovers the **full transformer cost**, owns and maintains it, and cannot supply other consumers from it. **No Development Charges** are levied.
β **For connections COVERED under the new SLC system (Clause 7.1):**
β **Load β€ 20 kW** (individual or combined for buildings): Pay **Development Charges** (as per Schedule) **plus SLC**.
β **Load > 20 kW** (individual or combined for buildings): Pay **SLC only**. **No Development Charges**.
**D. New Clauses Added:**
β **Clause 13:** Empowers the Commission to issue **orders and practice directions** for implementing this regulation.
β **Clause 14:** Grants the Commission the power to **amend, suspend, or repeal** any provision of this regulation in the future.
**4. Business Implications:**
β **For Consumers (Applicants):**
β **Predictable Costs:** Transparent, upfront Service Line Charges based on load and category.
β **Faster Processing:** Simplified process eliminates individual estimations and inspections for standard cases.
β **Lower Cost for Agriculture & Cottage Industries:** Fixed low rate of βΉ1,000/kW.
β **EV Charging Support:** Separate, slightly lower tariff slab to promote EV infrastructure.
β **No Transformer Cost:** Licensee bears the cost and maintenance of the distribution transformer for connections under the new SLC system.
β **For Distribution Licensees (DISCOMs):**
β **Streamlined Operations:** Uniform charges reduce administrative burden.
β **Revenue Clarity:** Clear framework for recovering connection costs.
β **Asset Ownership & Maintenance:** Responsible for transformers under the new SLC system.
β **Proposal Right:** Can file for revision of Service Line Charges periodically.
β **For the Regulatory Framework:**
β **Standardization:** Moves away from discretionary site-specific estimates.
β **Promotes Electrification:** Simplified and subsidized rates for key sectors (Agriculture, Cottage Industries, EV).
β **Future Flexibility:** Commission retains power to issue directives and amend rules as needed.
β-