❌

Normal view

Received yesterday β€” 31 January 2026

Appalachian clean technology investments decreased by millions in 2025

27 January 2026 at 20:22

New data from the Rhodium Group and MIT/CEEPR’s Clean Investment Monitor shows that clean technology manufacturing investment in Kentucky, Ohio, Pennsylvania and West Virginia has hit its lowest point in nearly three years. Established clean tech manufacturing investment in the region fell to $1.35 billion in Q4 2025 – a 21% decline from the peak…

The post Appalachian clean technology investments decreased by millions in 2025 appeared first on Solar Power World.

Received before yesterday

IronRidge integrates solar mounting design software with Scanifly

23 January 2026 at 20:56

Scanifly, A PV design and field operations software, is integrating design with IronRidge, a longtime solar racking and mounting supplier. The integration automatically transfers Scanifly design data and panel placement directly into IronRidge’s Design Assistant. The direct API (application programming interface) integration connects Scanifly’s design environment with IronRidge’s racking, bill of materials (BOM) and engineering…

The post IronRidge integrates solar mounting design software with Scanifly appeared first on Solar Power World.

Maryland utility initiative would support medically vulnerable with backup energy

22 January 2026 at 19:37

Baltimore Gas and Electric (BGE), Maryland’s largest energy utility, introduced a program on Tuesday that would provide zero-cost batteries for medically vulnerable customers. If adopted, the program would offer a solution for continuous power to customers who are at risk during power outages. BGE’s pilot program would provide utility-owned batteries free of charge to qualifying…

The post Maryland utility initiative would support medically vulnerable with backup energy appeared first on Solar Power World.

ERMCO starting 3-phase transformer factory in Arizona Production expected to begin in 2027.

21 January 2026 at 16:28

Electric Research and Manufacturing Cooperative (ERMCO), a distribution transformers manufacturer, is opening a new factory in Maricopa County, Arizona. The investment will create more than 500 jobs for the community. Located in in Waddell, approximately 30 miles west of Phoenix, the facility will expand ERMCO’s three-phase transformer production capabilities and while exploring new manufacturing options.…

The post ERMCO starting 3-phase transformer factory in Arizona <br><span style='color:#404040;font-weight:600;font-size:15px;'>Production expected to begin in 2027.</span> appeared first on Solar Power World.

❌